Gas installations

DRM is registered through OFGEM to Install Gas Pipework, Meters and any Associated Equipment up-to a pressure of 7Br. There are only a few welders in the UK coded to weld pressurised gas pipes. The ability to weld pipes - on site - in situ - means less need for expensive flanges, and no need for the incredibly expensive compression type fitting system.

It is critical you know your weld is coded for pressurised gas systems - any leaks are - without doubt - life threatening and it’s better to know that all welding work has been done to comply with legislation, by someone who understands their responsibilities completely

All Gas designs would be audited by DRM for compliance before works commence -ensuring all work carried out is in direct compliance with all associated regulations and safety standards

The moment we receive the go ahead, work commences from our office to ensure all pre- project co-ordination is ready to ensure a smooth installation process.  Pre-assembly of plant room Boiler Skids and pre- fabrication of all large diameter gas pipework is undertaken. This means by the time the site work begins, its modular, organised, supply chain managed and installs are made to look effortless.

Welding & Fabrication

It is common for miscommunication on site to lead to errors in positioning - and as a result - the intended parts of the gas pipe installation no longer do the job. DRM will come to site and build the part you need - test it and install - then commission the line for you. There are only a few welders in the UK with the correct welding qualifications to do this work on pressurised gas pipe - if your welder isn't qualified, your installation is NON-Compliant.

We are prepared to manage the entire gas installation works - ensuring compliance with up-to-date regulations, this often ends up costing less than these emergency welding jobs as errors when working to such specific specifications are less likely to occur.

Rebuilding parts on site

This is part of the main burner in a coffee roasting plant. As you can see - the original was not in the best of shape. Because this is a part for a boiler - it had to be made by a gas qualified engineer, as our MD is both gas and weld qualified this was an easy job to fix as no external sub-contractors were required.